Control Systems Interview Questions

499 control systems interview questions shared by candidates

All questions were related to profile, domain and resume. Questions were not asked too deeply but covered all the areas of QA both functional and automation like - 1] Defect severity/priority 2] SDTLC / Defect life cycle 3] Agile/Waterfall model 4] Smoke/Reg, etc types of testing 5]Core java, testng , sample code, selenium grid, POM, Architecture 6] SQl basic queries 7] All QA related basic and moderate questions along with a few tough ones. 2 and 3rd round - Mostly basic and experience related with few Scenario bases questions
avatar

Systems QA Analyst

Interviewed at Wells Fargo

3.5
Dec 7, 2018

All questions were related to profile, domain and resume. Questions were not asked too deeply but covered all the areas of QA both functional and automation like - 1] Defect severity/priority 2] SDTLC / Defect life cycle 3] Agile/Waterfall model 4] Smoke/Reg, etc types of testing 5]Core java, testng , sample code, selenium grid, POM, Architecture 6] SQl basic queries 7] All QA related basic and moderate questions along with a few tough ones. 2 and 3rd round - Mostly basic and experience related with few Scenario bases questions

1) These were the PLC questions on the first part of the 3 papers questions: When the address input "3.0" is ON, then the output "4.0" should be ON. When the address input "3.0 "is ON, then the output "4.1" should be ON and OFF every second (Timer 1 second On/OFF) When the address input "3.0" is OFF, then the output "4.2" should be OFF 2) The second part of the papers were questions about modifying names and assigning data on their proprietary SCADA/HMI software. 3) The 3rd part of the questions are about networking connections through the Server, Router, Modem, etc and trying to figure out the IP addresses and protocols.

1) These were the PLC questions on the first part of the 3 papers questions: When the address input "3.0" is ON, then the output "4.0" should be ON. When the address input "3.0 "is ON, then the output "4.1" should be ON and OFF every second (Timer 1 second On/OFF) When the address input "3.0" is OFF, then the output "4.2" should be OFF 2) The second part of the papers were questions about modifying names and assigning data on their proprietary SCADA/HMI software. 3) The 3rd part of the questions are about networking connections through the Server, Router, Modem, etc and trying to figure out the IP addresses and protocols.

Viewing 91 - 100 interview questions

Glassdoor has 499 interview questions and reports from Control systems interviews. Prepare for your interview. Get hired. Love your job.